p4newstreet logo

Posts tagged “C & L

Track laying done (well the tricky bits)

20140829-201810.jpg
I must admit I’m a bit out of practise with this track building stuff and this took a bit longer than I thought. Above is an overview of the trackwork so far with just some plain track still to do.
20140829-202102.jpg
First up is a double slip that isn’t! It’s actually just a normal turnout from an operational point of view with one end blocked and clamped so it doesn’t move.
20140829-202258.jpg
At the other end I’ve removed two of the point blades to depict that the line it leads too is out of use.
20140829-203224.jpg
On the other board is a 3 way point. I’ve always found these more tricky than double slips although they are less work.
20140829-203446.jpg
It’s the way the 3 vees have to interact that makes them tricky. I also messed up the first set of blades and got one in the wrong place so I had to do it again. It was only once I’d done it that I remembered I might have done exactly the same thing last time I did a 3 way!